UtahImprov.com
Where the Utah Improv Community Comes Together














Vote for UtahImprov.com @ The Improvisation Top 50

101 Improv Games for Children and Adults by Bob Bedore
101 Improv Games for Children and Adults by Utah Improviser and Quick Wits owner Bob Bedore



Forum
You must sign up to post messages.
Forum

The UtahImprov.com Forum - Topic Messages  
HomeHome HelpHelp Sign upSign up Log inLog in

Utah Improv Forum
Theory Discussion
Damage Repair for Highway Network

Moderators: Lord of the Board, jesster, ryloc

Pages: 1 2 3 4 5 6

shauna


Posts: 334
Gender:


happening page  
  Started at Wed Jan 18 23:48:35 2006
i just didn't want it to say N/A.... n/a more.. HA!

i want to come to the workshop. it would help if i knew the building. (names don't help.)

send me a message
e-mail me: nynja8@hotmail.com
or call (801) 791-2298
(much appreciated)

 
  ProfileProfile Send MessageSend Message  


Walken a Speer


Posts: 268
Gender:


Re: happening page  
  Reply #1 Posted at Thu Jan 19 13:03:48 2006
Assuming you know where weber state is, park in the pay park lot because you can't anywhere else and the pay lot is free by the time the meeting is over anyway.
Walk towards the Building in front of the pay park lot call the Val Browning Center when you get to the front doors don't go in, just turn left and walk down the side walk to the first buildin on your left and you'll see information desk. Ask them where the Wildcat theatre is and they'll point at it.


You gotta get inside.... a man's head...
 
  ProfileProfile Send MessageSend Message  


Junie B.


Posts: 93
Gender:


Re: happening page  
  Reply #2 Posted at Thu Jan 19 22:56:55 2006
Shawna,
You're going to 'prov with our troupe? Now I am almost sad that I am not there. I am excited. Shawna You're my favorite. Can't wait to do some crazy improv when I am forced to return.

~Kaytlin~


When is a reference to suicide not funny? *nudge*nudge*
 
  ProfileProfile Send MessageSend Message  


shauna


Posts: 334
Gender:


Re: happening page  
  Reply #3 Posted at Thu Jan 19 23:58:02 2006
do you have an estimated time of return? or do i have to talk to my commissioner about that?

 
  ProfileProfile Send MessageSend Message  


quangongzi


Posts: 76



Damage Repair for Highway Network  
  Reply #4 Posted at Wed Mar 15 20:37:40 2017
Pile into the hole, pile driver into the scene, according to the design of pile length, immersed into the depth of the rack to determine the height and length of the immersed tube (with paint on the tube section marked long pile), and assembly. Pile driver in place: according to the design pile position pile, pile driver to maintain the level, solid, adjust the sun and the vertical ground to ensure that the vertical deviation of not more than 1%. Start the motor, sink to the scheduled elevation, stop. In the process of sedimentation, a record should be made to observe the change of the excitation current and to note the change of the soil. Mix the mix according to the design mix, the mixture is concentrated by the mixing station. Slump should be 120 ~ 160mm, stirring time shall not be less than 2min. Double Steel Roller - Road Machinery Equipment Manufacturers - Doan Machinery
To be submerged to the design elevation as soon as possible after the feeding, until the tube mixture with the steel pipe material mouth flush. Such as the amount of material is not enough to be in the process of extubation in the air to add feeding to ensure that the piles of pile height to meet the design requirements. Start the motor, immersed in situ to stay vibration 5 ~ 10S, and then edge vibration edge extubation, extubation speed is generally controlled at 1.0 ~ 1.2m / min, in case of mud or muddy soil, extubation speed may be appropriate to slow down Tube process does not allow anti-plug. When the pile pipe pulled out of the ground, confirmed that the pile reached the design height, the embedded pile cap steel, and then move the machine to continue the next pile construction, construction process to do the construction records. After a period of 28 days after the completion of the pile foundation, check whether the pile quality meets the design requirements.Road Repair Machines

Immersed tube: pile driver in place to be smooth, stable, adjust the vertical and vertical ground, to ensure that the vertical deviation of not more than 1%. Start the motor, began to sink, immersed in the process of attention to adjust the stability of the pile driver is strictly prohibited tilt and dislocation. Immersed in the process of construction records. Feeding: to be submerged to the design elevation should be as soon as possible after the feed, until the tube mixture with the steel pipe feeding mouth flush. If the amount of material is not enough, must be in the process of extubation in the air feeding, in order to ensure that the pile height to meet the design requirements. Mixing ratio should be strictly enforced design requirements, pile into the pile after the top of the floating slurry thickness is generally not more than 200mm. Mix the mixture to be uniform, stirring time shall not be less than 2min. Construction sequence: before the construction of the original surface and slope should be clear table processing, leveling the site, excavation of the first level, and then backfill compaction, rolling to the original surface, and then the construction of concrete pile, On the surface of 25cm, easy to construction pile cap, concrete concrete pile construction should start from the old slope foot, and then push out the slope pile to the roadbed to fill the pile after the elevation. Piling machine row by row. The spacing between adjacent two piles in construction shall not exceed the initial setting time of the mixture so as not to affect the strength of the mixture.
asphalt crack repair methods
paddock maintenance machinery
heavy plant machinery for sale


 
  ProfileProfile Send MessageSend Message  


valiance


Posts: 232036



Re: Damage Repair for Highway Network  
  Reply #5 Posted at Sat May 26 14:27:08 2018
pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904


 
  ProfileProfile Send MessageSend Message  


valiance


Posts: 232036



Re: Damage Repair for Highway Network  
  Reply #6 Posted at Sat May 26 14:27:37 2018
pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904


 
  ProfileProfile Send MessageSend Message  


valiance


Posts: 232036



Re: Damage Repair for Highway Network  
  Reply #7 Posted at Sat May 26 14:27:53 2018
pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904


 
  ProfileProfile Send MessageSend Message  


valiance


Posts: 232036



Re: Damage Repair for Highway Network  
  Reply #8 Posted at Sat May 26 14:28:09 2018
pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904


 
  ProfileProfile Send MessageSend Message  


valiance


Posts: 232036



Re: Damage Repair for Highway Network  
  Reply #9 Posted at Sat May 26 14:28:25 2018
pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904


 
  ProfileProfile Send MessageSend Message  


valiance


Posts: 232036



Re: Damage Repair for Highway Network  
  Reply #10 Posted at Sat May 26 14:28:41 2018
pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904


 
  ProfileProfile Send MessageSend Message  


valiance


Posts: 232036



Re: Damage Repair for Highway Network  
  Reply #11 Posted at Sat May 26 14:28:57 2018
pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904pb904


 
  ProfileProfile Send MessageSend Message  


valiance


Posts: 232036



Re: Damage Repair for Highway Network  
  Reply #12 Posted at Sat Sep 29 09:17:26 2018
audiobookkeeper.rucottagenet.rueyesvision.rueyesvisions.comkinozones.rulaserlens.rumedinfobooks.rump3lists.ruspicetrade.ruspysale.rustungun.rulargeheart.rulasercalibration.rulaserpulse.rulaterevent.ru


 
  ProfileProfile Send MessageSend Message  


valiance


Posts: 232036



Re: Damage Repair for Highway Network  
  Reply #13 Posted at Sat Sep 29 09:17:50 2018
nameresolution.runaphtheneseries.runarrowmouthed.runationalcensus.runaturalfunctor.runavelseed.runeatplaster.runecroticcaries.runegativefibration.runeighbouringrights.ruobjectmodule.ruobservationballoon.ruobstructivepatent.ruoceanmining.ruoctupolephonon.ru


 
  ProfileProfile Send MessageSend Message  


valiance


Posts: 232036



Re: Damage Repair for Highway Network  
  Reply #14 Posted at Sat Sep 29 09:18:14 2018
qualitybooster.ruquasimoney.ruquenchedspark.ruquodrecuperet.rurabbetledge.ruradialchaser.ruradiationestimator.rurailwaybridge.rurandomcoloration.rurapidgrowth.rurattlesnakemaster.rureachthroughregion.rureadingmagnifier.rurearchain.rurecessioncone.ru


 
  ProfileProfile Send MessageSend Message  


valiance


Posts: 232036



Re: Damage Repair for Highway Network  
  Reply #15 Posted at Sat Sep 29 09:18:38 2018
seawaterpump.rusecondaryblock.rusecularclergy.ruseismicefficiency.ruselectivediffuser.rusemiasphalticflux.rusemifinishmachining.rutacticaldiameter.rutailstockcenter.rutamecurve.rutapecorrection.rutappingchuck.rutaskreasoning.rutechnicalgrade.rutelangiectaticlipoma.ru


 
  ProfileProfile Send MessageSend Message  


valiance


Posts: 232036



Re: Damage Repair for Highway Network  
  Reply #16 Posted at Sat Sep 29 09:19:02 2018
kaposidisease.rukeepagoodoffing.rukeepsmthinhand.rukentishglory.rukerbweight.rukerrrotation.rukeymanassurance.rukeyserum.rukickplate.rukillthefattedcalf.rukilowattsecond.rukingweakfish.rukleinbottle.rukneejoint.ruknifesethouse.ru


 
  ProfileProfile Send MessageSend Message  


valiance


Posts: 232036



Re: Damage Repair for Highway Network  
  Reply #17 Posted at Sat Sep 29 09:19:27 2018
lambdatransition.rulaminatedmaterial.rulammasshoot.rulamphouse.rulancecorporal.rulancingdie.rulandingdoor.rulandmarksensor.rulandreform.rulanduseratio.rulanguagelaboratory.rufactoringfee.rufilmzones.rugadwall.rugaffertape.ru


 
  ProfileProfile Send MessageSend Message  


valiance


Posts: 232036



Re: Damage Repair for Highway Network  
  Reply #18 Posted at Sat Sep 29 09:19:51 2018
geartreating.rugeneralizedanalysis.rugeneralprovisions.rugeophysicalprobe.rugeriatricnurse.rugetintoaflap.rugetthebounce.ruhabeascorpus.ruhabituate.ruhackedbolt.ruhackworker.ruhadronicannihilation.ruhaemagglutinin.ruhailsquall.ruhairysphere.ru


 
  ProfileProfile Send MessageSend Message  


valiance


Posts: 232036



Re: Damage Repair for Highway Network  
  Reply #19 Posted at Sat Sep 29 09:20:16 2018
hatchholddown.ruhaveafinetime.ruhazardousatmosphere.ruheadregulator.ruheartofgold.ruheatageingresistance.ruheatinggas.ruheavydutymetalcutting.rujacketedwall.rujapanesecedar.rujibtypecrane.rujobabandonment.ru

 
  ProfileProfile Send MessageSend Message  


valiance


Posts: 232036



Re: Damage Repair for Highway Network  
  Reply #20 Posted at Sat Jan 5 18:40:35 2019
поÐ&fraq14;

 
  ProfileProfile Send MessageSend Message  


valiance


Posts: 232036



Re: Damage Repair for Highway Network  
  Reply #21 Posted at Sat Jan 5 18:40:51 2019
248

 
  ProfileProfile Send MessageSend Message  


valiance


Posts: 232036



Re: Damage Repair for Highway Network  
  Reply #22 Posted at Sat Jan 5 18:41:20 2019
Bet

 
  ProfileProfile Send MessageSend Message  


valiance


Posts: 232036



Re: Damage Repair for Highway Network  
  Reply #23 Posted at Sat Jan 5 18:41:36 2019
Liv

 
  ProfileProfile Send MessageSend Message  


valiance


Posts: 232036

Re: Damage Repair for Highway Network  
  Reply #24 Posted at Sat Jan 5 18:41:52 2019
пÑи

 
  ProfileProfile Send MessageSend Message  
Pages: 1 2 3 4 5 6


Member List Member List
Who's online: 42 guests


This message board is powered by X-Forum, created by Diederik v/d Boor [more info]
This site's webmaster: (webmaster@utahimprov.com)